Given that we are constantly preoccupied with the development, our offer includes investment and rehabilitation works for the execution, expansion and upgrading of electricity networks and systems.
Upgrading, rehabilitation and new works for:
Overhead electric lines (LEA) and underground electric lines (LES) with voltages ranging between 0.4 – 110 kV kV;
Transformer stations;
110 kV/medium voltage transformer stations, 220 kV / 110 kV/medium voltage transformer stations and supply sites;
Expansions of low and medium voltage electric networks;
Monophase and three-phase derivations;
Medium voltage and 110kV cells installed in transformer stations;
Metering groups;
Execution of temporary connections, site organization and works at consumers, covered by the connection charge;
Installation of metering and protection blocks in low voltage systems;
Key works;
Service, guarantee and post-guarantee for energy systems and equipment;
Situatii avarii TS TN
Va informam ca termenul limita pana la care se pot receptiona buletinele de vot prin corespondenta si imputernicirile speciale sau generale pentru exercitarea dreptului de vot in cadrul Adunarii Generale a Actionarilor din data de 26/27 octombrie 2017 este vineri, 20 octombrie 2017, ora 17:00, respectiv cu cel putin 2 zile lucratoare inainte de data desfasurarii sedintei AGOA si respectiv AGEA. Formularele vor fi insotite de documentele care sa ateste indeplinirea cerintelor de identificare prevazute la Sectiunea I din Convocatorul suplimentat (Cerinţele de identificare aplicabile acţionarilor).
Scroll to Top
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.